Pry the tile loose from underneath. After all the tiles are removed, you may need to smooth the subfloor with a sander.
Break up the first tile with the blunt edge of a hammer (image 1), and then use a chisel to pry up the remainder of the first tile.
How to demo a bathroom tile floor. So, your next step will be to remove the baseboard and any trim on the walls (we had a chair rail that was about halfway up) and then remove the mirror. Contractor trash bags (they’re super heavy duty and don’t rip) drop cloths; Prep the room and floor;
How to demo bathroom tile: Once this first tile is removed, place the chisel against the bottom edge of adjacent tiles, apply pressure with your hammer and the tiles should pop up easily (image 2). Remove from home and dispose of legally.
One way to deal with the tile floor in your bathroom is to simply keep it as it is and remodel around it. So, we tore into the old drywall with a hammer (so satisfying!) and then broke down the larger pieces for the trash. Basic labor to remove bathroom tile with favorable site conditions.
Do the same in a horizontal line for the tile along top of your shower. Use the rubber grout float to level all the tiles and encourage adhesion. Its an older way to prep a floor to allow for tile installation.
The two day demo process gave us the clean slate we were after. We’re showing you how to demo a bathroom and specifically, giving you some tips for removing tile floor. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup.
Detach tile and mortar from backing surface. Then get to business and shut off the water at the valve (almost always behind/below the toilet.) then, when the water is off, flush the toilet to empty the tank. This method is slower, but allows you to save some of the tiles for reuse.
If you’ve never taken a toilet out before, first things first. It’s kinda surprising the number of supplies you’ll need to demo a bathroom, but we recommend stocking up on the following. Break into haul able pieces.
After all the tiles are removed, you may need to smooth the subfloor with a sander. If there is no obvious starting point, choose a gout line near a corner. Here’s a simple breakdown of the painting process:
If you don�t want to do that, it may be because you�ve never been able to properly clean. In fact, adam ran to grab lunch for us and in the time he left and came back with delicious chicken sandwiches, i had the entire bathroom floor done! Use a reciprocating saw to cut.
Scrape away some of the grout in a long line using a utility knife, grout saw, or rotary grinder. Break up the first tile with the blunt edge of a hammer (image 1), and then use a chisel to pry up the remainder of the first tile. Resolve yourself to the toilet water thing.
Remove trim, the mirror, etc. Broken tiles and loose grout, where the floor is already compromised, are great places to start. Although it is more expensive, i used a premixed thinset to save some time.
Carefully continue to lay tile. Place a chisel against the edge of a tile in this line, almost flat against a wall, and tap with a hammer. I suppose a person could potentially reuse the old drywall, but with mine so wrecked from old tile adhesive, the easier approach seemed to be to replace the damaged areas.
Choose a starting point, and work the masonry chisel under a tile. I left walkways so i didn’t tile myself in. Pry the tile loose from underneath.
It was used to allow for the floor to breathe, so any moisture that got past the tile mortar didn�t get trapped between the tile and the base (as it would if you just used concrete). As you demo a room, you basically want to start with the easiest things to remove and work your way up to the hardest things. Score, then hammer old drywall.
It won’t refill, because the water is off. Use a hammer and chisel to chip away a vertical line of tile, starting at the rounded tiles on the edge of your shower. Before we tackle the potpourri medley hexagon tiles for the new floor, i’ll be going over any remnants of the old mortar with a grinder to make sure there is a flat and level surface for the floor tiles.
If you’re hopping over here from the jeffrey. Then we just peeled that back and removed it in pieces. Underneath the tile was a mesh backing and cement board.
So far, we’ve removed the toilet, sink, mirror, hardware, light fixture, shoe molding and baseboards, floor tile, shower stall, and insulation.then we roughed in the plumbing, leveled the floor, hung insulation, and installed cement board on the floors and walls.